In progress · You can explore this page. Some readings and saved workflows are still being checked; payments remain off.
Written guidance · one sequence · $197
The Full Oasis Plan
Your four reads, brought together in a written document: what to check first, what to do next, and what can wait. From a windowsill to a yard or acreage, your place and priorities set the sequence. $197 once; your plan is built after payment.
One payment. No plan, no subscription, yours to keep. Reserve now with no charge today. Stripe is coming soon; your plan is built after payment.
A document you can return to
Your next moves, in a useful order
01
Read what’s here
Gather your IQ findings, household needs and site constraints. Keep sourced estimates separate from what you still need to measure.
02
Choose the first move
Put practical checks before purchases. Identify the dependencies, effort and trade-offs behind the projects you’re considering.
03
Build in sequence
Follow a written order across Energy, Land & Food, Water and Home, with related guides and questions for qualified local professionals.
This is planning guidance, not an engineered design, installation quote or savings guarantee. Missing inputs stay visible; you’ll know what needs checking before committing to a build.
Written direction or a conversation with Joshua?
Full Oasis Plan · $197 once
A written, sequenced document
Choose this when you want your findings and next steps in one document you can work through at your own pace. A personal review and video call are not included.
Walk the Land · In person from $395
Walk together · in person or by video
Half day (3 hours) $395 or full day (6 hours) $795 in Western NC; ask about a 90-minute virtual walk from anywhere. Full Oasis Plan included, printed for in-person arrival. Travel beyond 30 minutes is quoted at booking. No charge today.
LandIQ, WaterIQ, EnergyIQ and HomeIQ. Score yourself, see your numbers, keep them.
Level 2 — free, costs an email
Your mini report
Unlock the printable version of your read with your name and email.
Level 3 — $197 once
The FullOASISPlan
All four legs, cross-referenced, sequenced and costed into one build order for your property.
What lands in your inbox
Four sections, one property, read against each other — because the roof that carries your panels is the roof that catches your water, and the slope that drains your beds is the slope your tanks want to sit above.
Your land, read properly
Location-based soil, terrain and sun context; verify parcel boundaries separately
Soil series, drainage class and what it means for beds, ponds and footings
Public flood and wetland context; confirm setbacks and buildability locally
Frost dates, growing days and a planting calendar keyed to your coordinates
Your water, end to end
Monthly catchment estimates from rainfall normals and your supplied roof area
Storage sizing for your dry stretch — tanks, cisterns, or pond
Explore well, spring and surface-water options from your answers
Irrigation layout sized to the beds you told us you want
Your power, sized and costed
Array size, panel count and usable roof planes from satellite imagery
Battery sizing for the outage length you said you care about
Modeled solar production and financial estimates with stated assumptions
Grid-tied, hybrid or off-grid — the honest recommendation for your site
Your household, sequenced
Energy, food, water, waste and resilience scored against your answers
The efficiency work that must happen before you spend a dollar on hardware
Food production matched to your space, from acreage to a windowsill
A twelve-month sequence: what to do first, next, and what can wait
And the part that turns it into work
Your phased build order, first move to finished system
Budget bands with assumptions to verify before you build
Related guides and kit options to check for compatibility
A print-ready PDF you can hand to a builder, driller or installer
The honest math
A clearer beginning before you buy equipment
Prepare your questions, compare assumptions and discuss your next steps with qualified local professionals. Not because the plan is clever, but because knowing your own numbers changes every conversation you have about your property.
Stop overpaying on contractor quotes
Bring your report’s estimates and assumptions to each quote. Ask the contractor to verify site conditions, explain sizing and identify any additional assessment needed.
Compare scope and assumptions before choosing a bid
Fix and upgrade your own systems
Explore a sequence of projects, their assumptions and related guides. Confirm electrical, plumbing, structural and permit requirements with qualified local professionals.
Identify work to explore yourself and work requiring qualified help
Stop buying the wrong thing first
Compare efficiency, collection, storage and backup needs before buying equipment. Use your recorded needs and site constraints to decide the order.
Sequence purchases around verified needs
Learn to live in balance with the elements
Beyond the dollars: you end up understanding your own sun, soil, rainfall and household loads well enough to make every future decision yourself, without paying anyone to read it back to you.
Compounds every year you stay on the land
Listed price · payment after confirmation
$197
One payment. No plan, no subscription, yours to keep. Reserve now with no charge today. Stripe is coming soon; your plan is built after payment.
Reservation only. No charge today. We’ll confirm your plan’s scope, payment and applicable refund terms before you pay.
After your plan
TheOASISCircle
Reserve the Circle with no charge today. Member pricing on kits can apply after paid enrollment. The community, case-study library, monthly teardowns and quarterly live build review are coming with the Circle launch. Reservation pricing is $37 a month or $397 a year. Never a requirement.
Your written report gives you direction. Your private working plan keeps your projects, order, notes and budget together; existing Elements tools help you check again as your needs change.
Use the confirmed written plan, once paid and delivered, to choose the first project and its prerequisites.
The effort it takes
Begin with one short observation session; project effort depends on the moves you choose.
Who it’s not for
Not for engineered drawings, guaranteed savings or a personal video consultation.
No outcome range is estimated without your sizes, loads, chosen moves and confirmed scope. Reservations take no payment and do not grant access.
Common questions
What do I actually receive for $197?
One comprehensive plan for your property covering all four legs — land, water, energy and household — cross-referenced, sequenced and costed into a single build order. It arrives as a PDF you keep. Reserve with no charge today; your plan is built after payment.
How is this different from the free reports?
The free Elements reports each read one leg of your property in isolation. The Full Oasis Plan reads all four together, resolves the conflicts between them, and tells you what to do first, second and third on your specific site.
Is this a subscription?
No. It's one payment of $197 with no plan and no subscription, and the plan is yours to keep. The Oasis Circle membership is offered separately at checkout and is never a requirement.
What if the plan isn't worth it?
Review the scope with us before paying. We’ll confirm applicable refund terms and what your plan will include; no charge is taken with your reservation.
Do I need acreage for this to be useful?
No. The plan reads whatever you have: a rural parcel, a suburban yard or a balcony. The moves change with the scale, the method doesn't.
How long does it take to get my plan?
Reserve now with no charge today. We’ll email to confirm details and send payment instructions. Your plan is built after payment; we do not promise a delivery time before confirmation.